Dp Dual Trac 20 Assembly Instructions Full Patched
Lift the top frame channel and place it over the peaks of both upright towers. Secure it to the uprights using the long hex bolts. Step 3: Slide Rods and Weight Stack
Place the top weight plate (with the selector rod attached) on top of the stack. Top Crossbar & Overhead Pulley
The cables should be taut but not lifting the top weight plate off the stack when the machine is at rest. If there is too much slack, adjust the pulley positions using the alternative holes in the brackets. dp dual trac 20 assembly instructions full
Before full tension, thread each cable through its pulleys with the carriages removed. Then install carriages over the cables.
Position the main upright mast onto the base frame. Secure it using the hex bolts and flat washers. Pro Tip: Tighten these bolts only finger-tight until the entire frame is assembled to allow for alignment adjustments. Step 2: The Seat and Rail System Lift the top frame channel and place it
Look for any fraying in the nylon coating of the cables.
: 16 individual cement-filled weight plates (approx. 11 lbs each) providing up to 210 lbs of resistance. Top Crossbar & Overhead Pulley The cables should
Bolt the backrest pad directly to the vertical mast using the pre-drilled holes on the rear of the pad.
